Logistics and Design for Cardiff Development Project

The site is situated in a well-populated area of Cardiff close to the city centre. Therefore, a detailed site logistics plan is required in consideration of the steel frame erection and materials storage. The proposed design is robust and consists of a steel frame system with external brick work. The proposed design is in accordance with the Welsh Government Development Quality Requirements (DQR) and Secured by Design. The project consists of 8 Nr. 2B3P and 27 Nr. 1B2P flats. The project is due to complete towards the end of 2023 /beginning of 2024 for Cardiff Community Housing Assoication.

Longcross House
Longcross House

About the project

The building will achieve an EPC ‘A’ rating through incorporating renewable energy sources and energy efficient materials/building components into the design.

We will prioritise the employment of local labour and suppliers where possible. We plan on giving back to the local community, details of how this will be achieved are being considered. In addition, the development will be registered with the  Considerate Constructors Scheme for the duration of the project.

The project is due to start in June 2022  with an expected project duration of 60 weeks.

More case studies

Porth Junior School
Porth Junior School

Former Porth school to be replaced by 6 houses, 9 flats, and infrastructure.

View case study ->
Aberdare Girl's School
Aberdare Girl's School

Aberdare Girls School renovated into 44 apartments for the over 55's and 18 bungalows

View case study ->